What order to add pool chemicals
Test first. Then: acid (to lower pH or alkalinity), then baking soda or soda ash, then chlorine, then calcium, then stabilizer or salt. Wait at least 30 minutes between chemicals with the pump running, and never add acid and chlorine together.
Try it with your numbers
Free, no sign-up. Enter your gallons and test results; the calculator gives amounts in cups, quarts and pounds, in the order to add them.
Why this order
pH and alkalinity change how other chemicals behave, so they go first. Chlorine works better once pH is near 7.5. Calcium chloride should be kept 12 hours away from baking soda or soda ash, or it can cloud the water. Stabilizer and salt dissolve slowly and do not react with anything, so they go last.
The calculator on this page follows the same order and adds the wait times for each chemical.
Common questions
Can I add chlorine and baking soda at the same time?
Add them separately, at different spots, with the pump running. Waiting between them makes it easier to see what each one did.
How long to wait between pool chemicals?
At least 30 minutes with the pump running for most. 12 hours between calcium chloride and baking soda or soda ash. Salt needs about 24 hours with the cell off.